Integrated projects onshore and offshore
Transporting and installing frame “TMP”
Marine project

Transporting and installing frame “TMP”

About the project

Transporting and installing frame “TMP"

Transportation of the SPBU “Mercury” from the construction plant (ASPO, Astrakhan), where the platform was built from modules, along the Volga‑Caspian Canal in the Caspian Sea.

Transporting and installing frame “TMP"
The SPBU “Mercury” was transported from the construction plant (ASPO, Astrakhan), where the platform was built from modules, via the Volga‑Caspian Canal in the Caspian Sea. The SPBU “Mercury” had the following dimensions: Lmax=101 m, Bmax=74 m, draft 4.5 m, displacement 11,000 tons. The platform was towed under conditions where the object’s dimensional characteristics exceeded the limited restrictions established on the Volga‑Caspian Sea Shipping Canal. Difficult hydrometeorological conditions on the canal, including: wind‑driven sea level fluctuations and ice conditions. An icebreaking fleet was involved in the towing operation.
Key metrics
2015
Year the work was completed
Lamprell Energy
Customer
Volga‑Caspian Canal
Location
Naval operations
Project type
Operation parameters

Transportation of the SPBU “Mercury”

101 м.
Л.наиб.
74 м.
В.птах.
4,5 м.
Осадка
11000 тонн
Водоизмещение
Presence

Our offices

Astrakhan
414018, Admirala Nakhimova St., 60, office 702
Astrakhan
414015, Zavodskaya Sq., 7
Contact us