Marine project
Under-rig hub and rig LSP-2 transportation and installation
About the project
Under-rig hub and rig LSP-2 transportation and installation
Separate transportation of the sub‑derrick base and sections of the LSP‑2 drilling derrick. Cargo operations for the installation of the sub‑derrick and sections of the LSP‑2 BV, management of offshore operations and operation of the p/c “Volgar”, TP “Sevan”, ballast operations.
Separate transportation of the sub‑derrick base and sections of the LSP‑2 drilling derrick. Cargo operations for the installation of the sub‑derrick and sections of the LSP‑2 BV, management of offshore operations and operation of the p/c “Volgar”, TP “Sevan”, ballast operations.
Key metrics
2017
Год выполнения работ
Лукойнижневолжскнефть
Заказчик
м/р им. Филановского
Местоположение
Речные операции
Тип проекта
Operation parameters
Транспортировка и установка в море подвышечного портала и буровой вышки ЛСП-2
101 м.
Л.наиб.
74 м.
B max
4,5 м.
Осадка
11000 тонн
Водоизмещение