Marine project
Block-conductor support base installation
Block-conductor support base installation
Block-conductor support base installation (Korchagin field) on sea shelf, stilt bailing and hydraulic swaging
Установка опорного основания Блок-кондуктора
Заполнить текстом Заполнить текстом Заполнить текстом Заполнить текстом Заполнить текстом Заполнить текстом Заполнить текстом Заполнить текстом Заполнить текстом Заполнить текстом
During the operation, constant maritime monitoring, ballast management, and operational communication with the coastal service were ensured. All work was carried out in accordance with the requirements of the Maritime Register and international standards. Specialists from Marine Engineering Caspian and Marine Installation Service participated in the project, ensuring the safe delivery of the unit to its destination without delays or incidents.
Tasks and conditions
The SPBU “Mercury” was transported from the construction plant (ASPO, Astrakhan), where the platform was built from modules, via the Volga‑Caspian Canal in the Caspian Sea.
Сложности
Сложные гидрометеоусловия на канале, включая: сгонно-нагонные ветра, ледовая обстановка.
Decision
The platform was towed under conditions where the object’s dimensional characteristics exceeded the limited restrictions established on the Volga‑Caspian Sea Shipping Canal.
An icebreaker fleet was used for the towing.