Integrated projects onshore and offshore
Under-rig hub and rig LSP-2 transportation and installation

Under-rig hub and rig LSP-2 transportation and installation

About the project

Under-rig hub and rig LSP-2 transportation and installation

Separate transportation of the sub‑derrick base and sections of the LSP‑2 drilling derrick. Cargo operations for the installation of the sub‑derrick and sections of the LSP‑2 BV, management of offshore operations and operation of the p/c “Volgar”, TP “Sevan”, ballast operations.

Under-rig hub and rig LSP-2 transportation and installation
Separate transportation of the sub‑derrick base and sections of the LSP‑2 drilling derrick. Cargo operations for the installation of the sub‑derrick and sections of the LSP‑2 BV, management of offshore operations and operation of the p/c “Volgar”, TP “Sevan”, ballast operations.
Key metrics
2017
Год выполнения работ
Лукойнижневолжскнефть
Заказчик
м/р им. Филановского
Местоположение
Речные операции
Тип проекта
Operation parameters

Транспортировка и установка в море подвышечного портала и буровой вышки ЛСП-2

Route map
101 м.
Л.наиб.
74 м.
B max
4,5 м.
Осадка
11000 тонн
Водоизмещение
Presence